Scandoil.com

Tethys Oil spuds Jebel Aswad-2 well in Oman


Published Jun 6, 2008
[an error occurred while processing this directive]

Edit page New page Hide edit links

Tethys Oil provides update of Oman operations

Tethys Oil (Tethys) has spudded Jebel Aswad-2 (JAS-2) on Block 15 onshore Oman. The well is drilled to further delineate the Natih A limestone reservoir and it is designed to optimize production rates.

JAS-2 is drilled 1.2 kilometres south west of Jebel Aswad-1, which was drilled last year and flowed 2,626 BOEPD on test. Drilling operations are expected to take 65 days including testing, and the well is expected to reach a final depth of 3,200 metres. At target depth, one or two horizontal sidetracks of a total length of an additional 1,000 metres are planned.

The Abraj 204 rig currently contracted with Oilex plc is being used.

Follow the drilling operations through pictures at the image gallery at www.tethysoil.com.

Tethys has a 40 per cent interest and is operator of Block 15. Danish company Odin Energi is partner holding 60 per cent interest.




   

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml


 

Home