Scandoil.com

Texon spuds third well at Leighton field


Published Aug 21, 2009
[an error occurred while processing this directive]

Edit page New page Hide edit links

Texon Petroleum Limited

Texon Petroleum has advised that drilling of the third Leighton well, Tyler Ranch #2, commenced on August 19, 2009. The well has a planned total depth of 2,743 meters (9,000 feet) and will take about 15 days to reach its target, which is the oil and gas producing reservoir in the first two Leighton wells (Peeler #1 and Tyler Ranch #1).

The Tyler Ranch #2 well is located between the first two Leighton wells Peeler #1 and Tyler Ranch #1. Should it prove successful, the well can be tied into the gas sales pipeline and oil tanks which are 200m away within four weeks of completing the well.

Global has a 15% working interest (11.25% net revenue interest) in the Leighton Project with joint venture parties Texon Petroleum Limited (70%) and Excellong, Inc (15%).

Immediately following Tyler Ranch #2, it is planned to drill Tyler Ranch #3 which also has a planned total depth of 2,743m (9,000 ft) and this fourth well will be located 420m south of Tyler Ranch #1.

Tags: Texon Petroleum Limited




   

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml


 

Home