Scandoil.com

Texon starts drilling at Tyler Ranch


Published Apr 9, 2010
[an error occurred while processing this directive]

Edit page New page Hide edit links

Texon Petroleum Limited

Texon advised that the sixth Leighton well, Tyler Ranch #5, commenced drilling on April 7, 2010. The well has a planned total depth of 2,743 meters (9,000 feet) and will take about 12-15 days to drill. The well will penetrate the Olmos reservoir at approximately 2,676 meters (8,780 feet), which is the same oil and gas reservoir as is producing in the first five Leighton wells (Peeler #1, Tyler Ranch #1, Tyler Ranch #2 , Tyler Ranch #3 and Tyler Ranch #4). Tyler Ranch #5 is located 335 meters north of Tyler Ranch #2.

If the wire line electric logs indicate producible oil and gas in the Olmos reservoir, the well will be completed as the Company's sixth oil and gas producer from this zone in the Leighton Project. Texon has a 70% working interest (52.5% net revenue interest) in the Leighton Project with joint venture parties Global Petroleum Limited (15%) and Excellong, Inc (15%).

Tags: Texon Petroleum Limited




   

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml


 

Home