Scandoil.com

Aker Solutions to deliver on-vessel mooring systems


Published Aug 11, 2008
[an error occurred while processing this directive]

Edit page New page Hide edit links

Aker Kvaerner Subsea multibooster multiphase pump King-2

Aker Solutions has been awarded two contracts, one with Bluewater Industries Inc. and one with Daewoo Shipbuilding & Marine Engineering (DSME) for the design and supply of on-vessel mooring systems. The total contract value for Aker Solutions is approximately NOK 150 million.

The Bluewater contract consists of eccentric fairlead chain stoppers and roller RamWinches for a deep draft production unit owned by ATP Oil & Gas Corporation. The hull for the deep draft production unit of Moss Maritime's Octabuoy design will be built by Cosco Shipyard in China. After completion it will be located on the Cheviot field at the British Sector of the North Sea.

The DSME contract consists of eccentric fairlead chain stoppers for the Pazflor FPSO destined to operate in Angolan waters. The FPSO is being built by DSME in South Korea. The Pazflor field, operated by Total E&P Angola, is located approximately 200 kilometres off the coast of Angola and has a water depth of nearly 800 meters.

Aker Solutions, through its subsidiary Aker Pusnes AS, has developed the eccentric fairlead chain stoppers design which is an innovative on-vessel mooring solution with several advantages. With the eccentric fairlead chain stoppers the mooring load is secured at keel level thereby increasing the fatigue life of the chain. The design eliminates the need for reinforcements at the deck level thereby decreasing the overall weight.

Leif Haukom, President of Aker Pusnes AS, commented: "We are proud to be selected as maker of the on-vessel mooring equipment for the first production unit of Octabuoy design to be built. This contract underlines Aker Solutions' strong position for mooring systems to installations in harsh environments, such as the North Sea."

The equipment will be manufactured in Europe and South-Korea and the delivery will take place during 2009.

Below is a photo of Aker Solutions RamWinches onboard Independent Hub located in the Gulf of Mexico.

Tags: Aker Solutions, Bluewater Industries Inc., Daewoo Shipbuilding & Marine Engineering




   

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml


 

Home