Scandoil  

Shell's Olympus Hull departs South Korea


Published Nov 30, 2012
[an error occurred while processing this directive]

Edit page New page Hide edit links

Shell's Olympus Hull

Shell Offshore Inc.'s (Shell) Olympus hull, the approximately 32,500 metric ton main body of the Olympus TLP, departed from South Korea today to begin its two month journey to the U.S. Gulf Coast. After nearly 4 million man hours and a peak of approximately 1,300 workers on-site, construction of the Olympus hull was completed in November 2012. The hull will be transported from South Korea to Ingleside, TX on Dockwise's world-class Blue Marlin marine vessel, a semi-submersible heavy lift ship specifically designed to transport larger equipment above the ship's deck. The hull is expected to reach Ingleside, Texas in early 2013 where installation of the topsides will take place before the TLP departs for its final location on the Mars Field in the Gulf of Mexico.

The Mars Field, owned by Shell (71.5%) and BP (28.5%), and operated by Shell, continues to contribute to the Gulf of Mexico's position as a critical component of the US energy supply. Discovered in 1989 and brought onto production in 1996, the Mars Field is considered one of the largest resource basins in the Gulf of Mexico. The site for the Olympus TLP, known as the Mars B development, is located about 130-miles south of New Orleans in the Mississippi Canyon and lies in approximately 3000 feet of water.

Tags: Shell




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml