Scandoil  

CNOOC Limited begins oil production from K1A


Published Dec 9, 2014
CNOOC Limited

CNOOC Limited has started producing bitumen from Kinosis 1A (K1A), a new steam-assisted gravity drainage (SAGD) facility.

The K1A project, located approximately 12 kilometers south of the Long Lake SAGD and upgrader in Alberta, Canada, consists of steam-generating equipment, well pad facilities, 37 well pairs, and water and bitumen flowlines. Bitumen produced from K1A is processed and upgraded at Long Lake, which has an operating capacity of about 72,000 barrels per day (bpd) of bitumen. K1A is designed to produce 20,000 bpd of bitumen and is expected to play a significant role in filling the Long Lake plant.

Nexen ULC, a wholly-owned subsidiary of the Company, holds 100% interest and acts as the operator of K1A. The construction of K1A was completed on an industry-leading schedule with exceptional safety performance.

Tags: CNOOC Limited




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml