Scandoil.com

StatoilHydro to spud first well at Tyrihans


Published Apr 17, 2008
[an error occurred while processing this directive]

Edit page New page Hide edit links

StatoilHydro to spud first well at Tyrihans

The Transocean Arctic arrived on the Tyrihans field at Haltenbanken in the Norwegian Sea on 14 April for production drilling.

This is an important milestone which marks the start-up of an extensive drilling programme in the Norwegian Sea.

"We look forward to starting the drilling and completion activities after several years of planning," says Rune Skotvold, head of drilling operations for Tyrihans.

"Transocean Arctic" The planning work for the StatoilHydro-operated Tyrihans field started back in 1986.

The field is one of the largest development projects on the Norwegian continental shelf in the next few years.

The Tyrihans development involves extensive use of multilateral wells and smart wells with downhole regulation and control equipment.

Pumps for seawater injection will be installed directly on the seabed for enhanced recovery.

Eleven wells will be drilled and completed by the "Transocean Arctic". Seven of the wells are multilateral, i.e. that they have several trajectories in the reservoir for maximised oil recovery.

Eight production wells, two gas injectors and one seawater injector will be drilled. In addition, a gas production well is planned to be drilled in 2015.

Most of the wells will be equipped with downhole temperature and pressure gauges.

Tags: StatoilHydro, Tyrihans




   

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml


 

Home